OMC FLY SAFE. FLY TOGETHER.
BalduursGATE Field ManualPreparing a hauling contract4.10.0-hotfix (55227) · Version 1 · Sourced
FM · CARGO / HAULING · CARGO-VORBEREITUNG · guide.cargo-vorbereitungOnline version: https://oldmensclub.de/citizen-hub/academy/cargo-vorbereitung.en.html
BalduursGATE Field Manual · Academy · Edition 1
Cargo / HaulingLevel: Beginner

Preparing a hauling contract

Check before you accept: cargo grid, route, time window, equipment. So you do not find out at the freight elevator that it does not fit.

Valid from patch
4.10.0
Game data version
4.10.0-hotfix (55227)
Version
1
Updated
2026-09-11
Review statusSourced

Every control function and game object used exists in the current game version. The statements come from the sources listed.

Review path and sources

Editorial in-game review

Nobody from the editorial team has flown it in game yet. The information comes from the sources listed below.

What you will learn

  • Know before accepting whether ship and contract fit together.
  • Plan the route with pickup and destination.

Prerequisites

What this is about

Most of the time is lost not in flight but at the hangar: wrong amount, wrong ship, no tools. This preparation takes two minutes and saves half an hour.

Before accepting

  1. Check the cargo grid – how many containers fit at all? The dimensions are in cargo grid & stowage.
  2. Check the tools – multi-tool with tractor attachment or a vehicle with a tractor beam: tractor beam & moving cargo.
  3. Look at the route – pickup and destination, plus the question whether you have to refuel on the way.
  4. Plan the time – loading and unloading need a base time plus time per container according to the game data.q1

Check start, destination and amount

  • Calculate the amount in containers against the grid, do not estimate.
  • There has to be room in the warehouse at the destination – what happens otherwise is in unloading & delivering.
  • With several pickup points: settle the order before you depart.
If you are unsure, take the contract with the smaller amount the first time. A second flight is cheaper than half a load left standing.

Equipment

The full list is in the cargo / hauling operations checklist. To start with: a ship with a suitable grid, a multi-tool with tractor attachment, enough fuel, and a look at the legal status of the goods.

Next: freight elevator

Checklist

  • The cargo amount fits on your cargo grid.
  • You know the pickup point and the destination.
  • Multi-tool with tractor attachment or a vehicle with a tractor beam is with you.
  • You have planned time for loading, flight and unloading.

On your Stream Deck

These functions belong to this topic. Which key that is for you is shown by the BalduursGATE plugin based on your own bindings – on purpose, no key is listed here.

Profile page CARGO

  • Request Cargo Loading

Profile page FPS INTERACTION

  • Interaction Mode

Profile page MOBIGLAS

  • Toggle Inventory (short press)
  • mobiGlas (Toggle)

The profile page CARGO, MOBIGLAS is part of OMC Stream Deck 0.9.0. Go to the Download Center →

Read next

Links are stored in the hub entry – the index computes the reverse direction. No address is hard-coded here.

← Back to the Academy

Sources

  1. q1GAME DATAChronist-Auszug CARGO – Containergrößen mit Lade- und Entladezeit, Ladeflächen von Freight Elevator, Schiffen und Wagen (chronist/cargo.json)Build 4.10.0-hotfix (55227)Gezielt gelesen mit hub/werkzeuge/cargo-auszug.py aus dem DataCore-Export und der global.ini (EN/DE), jede Quelldatei mit Prüfsumme. Rohwerte in Metern und Sekunden, nicht gedeutet.

Patch and version information

Valid from
4.10.0
Valid until
open
Game data version
4.10.0-hotfix (55227)
Version
1 · EN Version 1
Review entries
none
Identifier
guide.cargo-vorbereitung